Bassin de Naurouze

The Bassin de Naurouze is an octagonal holding tank, created during the building of the Canal du Midi as designed and built by Pierre-Paul Riquet. It was abandoned a few years after construction of the canal because of its recurrent silting problems. The flow of water from the Bassin_de_St._Ferréol joins the Canal du Midi at this point near the Seuil de Naurouze. Riquet hoped to build a city around the basin and also considered building a port. However, it easily filled with silt and its use discontinued. A lawn replaced the empty pool, and it is crossed by a straight path lined with plane trees. [1] [2]

Bassin de Naurouze:

References

  1. ^ Rolt, L. T. C. (1973). From Sea to Sea. Ohio University Press. ISBN 8124-0152-1. 
  2. ^ Mukerji, Chandra (2009). Impossible Engineering: Technology and Territoriality on the Canal du Midi. Princeton University Press. ISBN 978-0-691-14032-2.